Statistical tables cable railways


Name of road

Clay

Sutter

California

Geary

Presidio

Chicago

Opened on

Sept. 1, 1873 

Jan. 27, 1877 

April 9, 1878

Feb. 16, 1880

Dec. 9, 1881

Jan. 28, 1882
Length in feet

5,300

13,291

12,651

13,200

10,500

24,812

Heaviest grade 307' in 2,800 167' in 4,300 265' in 2,800 83' in 1,925 246' in 5000 Level
Engines Two Six Three Two Two Four
Boilers Two Six Three fire box Three steel Three Four
Aver. pressure 67.5 pounds 100 pounds 70 pounds 65 pound 75 pounds 70 pounds
Coal used per day 3,700 pounds 24,640 15,680 11,230 4,200 16,000
Weight empty car 2,800 pounds 3,000 4,000 4,000 4,000 5,825
Empty dummy 2,100 pounds 2,000 3,000 4,800 4,000 5,150
Departure times 3 to 5 minutes 4 minute aver. 5 minutes aver. 2.5 to 6 aver. 5 minutes 3 minutes
Round trips daily 221 253 226 228 220 729
Hours run per day 17 1/2 19 1/2 19 19 19 20